tilers.tradeWall and floor tilers, town by town

For tilers, free

Tanking record and quote sheet

Two sheets, free for any UK tiler: a tanking record that shows what went behind the tiles in a wet area, signed by you and the customer, and a quote sheet with the measurements and your labour lines. Type your business name and add your logo, and both print with them at the top.

Why record the tanking

Tiles and grout are not waterproof. In a shower or a wet room the waterproofing is the membrane behind them, and once the room is tiled nobody can see it. A record of the primer, the membrane and its batch, the tapes, the drain and a flood test, with photos taken before the first tile went on, is the only evidence of what is there. It answers the question a leak raises years later, and it shows a customer the work they are paying for.

The quote sheet puts the measurements and each labour line on one page, so a customer can see how the total was reached, and whether tiles are in it.

Templates, not legal advice. Read both sheets through before you use them, change anything that does not fit how you work, and follow your membrane maker's instructions where they differ.

 

Tanking record

Job address

Customer Phone

Room or area Area tanked, m² Date

Substrate

Type: PlasterPlasterboardTile backer boardConcrete or screedPly or timberOther

Checked: DrySoundFlatClean, no dust

Moisture reading, if taken Notes

Primer

Product Batch Dry by

Membrane system

System and maker

Type: LiquidSheetBoard

Batch or lot Layers Thickness or coverage

Drying time between layers Dry before tiling at

Tapes and corners

Tape and corner product

Internal cornersExternal cornersPipe collarsBoard jointsFixings sealedWall to floor joint

Drain or tray

Type: Linear drainPoint drainShower trayTray former

Make and model

Drain flange bonded into the membraneFall to the drain checked

Flood test

Date Started at Ended at

Duration, hours Water depth, mm

Result: No drop in the water line, no damp below or besideLeak found and repaired, test repeated

Notes

Photos taken before tiling

  • The bare wall and floor, before priming
  • Primer on
  • Tapes and corner pieces in place
  • The drain or tray connection
  • The first layer of membrane
  • The finished membrane, every wall and the floor
  • The flood test at the start, with the water line marked
  • The flood test at the end

The membrane was put on to the maker's instructions and was dry before tiling started. Written with BS 5385-4 in mind; where the maker's instructions differ, theirs apply.

Tiler's signature

Date

Customer's signature

Date

 

Quote sheet

Customer Phone Email

Job address

Quote number Date Valid for, days

Measurements

AreaWalls, m²Floor, m²Notes
Total

Labour

WorkRateQuantityAmount
Wall tiling£ per m²
Floor tiling£ per m²
Large format tiles, extra£ per m²
Natural stone, extra£ per m²
Herringbone, diagonal or mosaic, extra£ per m²
Lifting old tiles or flooring£ per m²
Tanking£ per m²
Regrouting£ per m²
Laying underfloor heating£ per m²
Day rate£ per day
Labour subtotal
Minimum charge applies

Tiles and materials

Tiles bought by: The customerThe tiler

Tiles chosen Materials estimate

Before work starts

  • Building from before 2000 with old floor tiles, vinyl or textured finishes to come up: tested first, and the report seen.
  • Electric underfloor heating: the electrical side arranged with an electrician, who certifies or notifies it under Part P.
  • Wet area: tanking included above, recorded on the tanking record.

Start date Days on site

VAT Total

Tiler's signature

Date

Customer's signature

Date

Updated sheets by email

When these sheets change, the monthly report to every claimed listing says so, with a link. Claiming is free and needs no plan.

Find and claim your listing Not listed? List your business

Premium for tilers · For tilers